LG6 Underground Feasibility Study

Location & Client
Pilansberg, South Africa
Amcol – Batlhako Mining
Mining Method
Underground
Introduction
ABGM was requested by Batlhako Chrome Mine to undertake a pre-feasibility study – level capital (Capex) estimation study into the development of an underground LG6 operation which will replace the current diminishing LG6/6a open pit resources. The study included a LOM design, including primary surface and underground infrastructure, LOM production scheduling, estimated mining costs (Opex), and resource/reserve estimation.